Located at 6km south of Liulin County, Shanxi Province, Xingwu Coal Mine has a mining area of 11.63 sq.km. and has commenced production since 1968. According to the Technical Review Report of John T. Boyd Company, the in-place reserves and recoverable reserves of Xingwu Coal Mine was 63.23 million tons and 46.34 million tons respectively as at 31 December 2007. Currently, the planned raw coal production capacity of the coal mine is 2.1 million tons per annum.
The following is a summary of Xingwu Coal Mine :
Interest in project (%) |
65 |
Principal resources |
Hard coking coal and semi-hard coking coal |
Mining method |
Underground |
Year of initial operation |
1968 |
In-place reserves as at 31 December 2007(Mt) |
63.23 |
Recoverable reserves as
at 31 December 2007(Mt)
- Proven reserves
- Probable reserves
- Total proven and probable reserves
|
11.11
35.23
46.34
|
Planned raw coal production capacity at present (Mt per annum)
|
2.100 |
Coal preparation plant
Year of initial operation
Processing volume (Mt per annum) |
October 2002
1.20 |
Source: Technical Review Report prepared by John T. Boyd Company dated 25 June 2008

|